anti termite treatment procedure

Posted On: November 30, 2013

Pest-Cure anti termite treatment procedure

INITIAL INSPECTION & REPORT requires a complete thorough inspection of the buildings and surrounds, and a detailed written report on areas inspected, evidence found of termite activity, high risk termite entry areas inaccessible to inspection and termite control options and limitations thereto. Recommended as essential.

CHEMICAL SOIL TREATMENT around the perimeter and sub-floor of a building to eradicate termites attempting to gain entry into the building through a treated soil area. On the grounds of safety and effectiveness Termidor or Premise termiticide, are recommended for this purpose.

TERMITE BAITING and potential TERMITE COLONY ELIMINATION involves the installation and monitoring of termite bait stations asThis method relies heavily on the termites "finding" and consuming sufficient bait. Recommended in some circumstances.

BUILDING MODIFICATIONS and MAINTENANCE including some termite risk reduction measures the homeowner carry out, such as, improving sub-floor ventilation, removal of timber in contact with the soil, opening and clearing important inspection access areas.

Regular FOLLOW-UP INSPECTIONS are essential and should be carried out at least every 3 to 6 months where signs of termite activity has been located in the vicinity of susceptible buildings or timber structures.

Pest-Cure provides services for anti termite treatment procedure, Pest Control, Termite Control,  Ants Control, Bird Control, Beetle Control, Lizard Control, Cockroach Control, spider control, mosquito control, fly control, mouse control, bed bugs control

Comments on this post:
Share your views, Was this helpful? Ask your query...

Tell me what you're thinking...

Enter security code shown above: