Pre - Construction Termite Treatment

Pre-construction termite treatmentWe use highly professional and advanced techniques for treating the Termite Infestation at Pre- Construction Site with the Proceeding Stages. Direct liquid treatments are applied to the outside, inside and also in the foundation to eliminate the termites completely at Pre Construction sites. Injection of liquid Termiticide (Chloropyrophos 20%EC / Bifenthrin 2.5%EC / Imidaclorpopid) in areas like the foundation, within the foundation walls and also areas under the concrete slabs is part of our specialized termite control treatment plan.

TREATMENT METHODOLOGY & STAGES:

STEP 1: Foundation Level / Soil (External Treatment)
A chemical toxic barrier is created between the soil and the building that has to be protected. This is achieved in the following manner, If there exists a concrete cover or masonry apron around the walls of your building, holes are drilled as close as possible to the plinth wall about 300mm (1ft) apart from each other. Insecticide is then poured, so that it reaches the soil to eliminate the termites present there and to stop them from re-infesting. If your building is on pillars, the holes are drilled around the pillars and insecticide poured into the soil.
If there is loose earth around the walls of your building, trenches of a 'shovel width' are dug, exposing the external surfaces of the foundation wall up to a depth of 500 mm from the ground level. While re-filling the trenches, the dug up earth is returned in layers & insecticide is sprayed over the back fill earth.

STEP 2: Refilled Earth / Plinth Filling
Before laying the floor, we provide treatment at the top surface of the consolidated earth within the plinth walls & also ensure that back filling against foundation is treated to its full depth. Backfilled earth on each side of all built up walls, which will be in immediate contact with the foundation, will be treated with water base chemical solution at vertical surface of the substructure, to a depth of 45cm and width of 15cm. The chemical shall be directed towards the masonry surfaces so that earth in contact with these surfaces is well treated with the chemical.

STEP 3: Plinth Protection
At this stage a ring of chemical barrier will be provided at external perimeter of the site by digging holes at equal intervals & pouring chemical solution there in. This would give strength to the structure to resist termite from entering the premises through outer soil.

STEP 4: Under Floor Treatment:
This is an additional service for Anti- Termite treatment at Pre-Construction sites offered by Pest-Cure Incorporation. At this stage we spread Chemical Granules of Termiticide. After absorbing the water/moisture these granules burst & loose its outer covering & release chemical, which prevent & control the termite movement.

STEP 5: Vulnerable Wooden Portions of the Building:
Further, on all floors, treating them with the drilling operation also protects woodwork like doors and windows, which are highly susceptible to termite attack. Spot treatment of spraying on infested areas in the walls and ceiling is also carried out.

Warranty:
3-5 Years - In case of comprehensive anti-termite treatment of the entire building, we give a warranty of 3-5;years. Any re-infestation of termites during the warranty period is treated without any extra charge. Note: For Govt. Projects & Projects as per CPWD norms, Warranty is of 10 years.

We as Pest-Cure provides the services in India for pre construction anti termite treatment and for pre construction termite treatment.

Check Up Visits:

After the initial major treatment, our operator will visit your premises for a check up once in a year Necessary treatment will be carried out in case of any re-infestation. You can also call us in case of reappearance of termites during the contract period.

Actual Site Picture

Pre-construction termite treatment Pre-construction termite treatment Pre-construction termite treatment